Mustafa Kemal AYDIN | ![]() |
|||||
Civil Engineer, B.Sc
|
||||||
EDUCATION / EĞİTİM | ||||||
Orta Doğu Teknik Üniversitesi İnşaat Mühendisliği Bölümü 1994 / B. Sc in Civil Engineering, Middle East Technical University,1994 |
||||||
Fatih Üniversitesi Sosyal Bilimler Enstitüsü İşletme Yüksek Lisans, 2014 / Fatih University, Institute of Social Sciences MBA, 2014 | ||||||
DVS-IIW International Welding Engineering Training Program by GSI SLV-TR, Ankara, 2017 | ||||||
CERTIFICATES & TRAININGS ATTENDED / SERTİFİKALAR VE KATILINAN KURSLAR | ||||||
C-1 Tipi Bina Akustiği Sertifika Programı, 26-29 Aralık 2018, Çevre Mühendisleri Odası, İzmir | ||||||
A-2 Mühendislik Akustiği Sertifika Eğitim Programı, 20-23 Kasım 2018, Çevre Mühendisleri Odası, İzmir | ||||||
Yönetici Geliştirme Programı, Folkart Akademi & Qmark, Ocak 2018, İzmir |
||||||
International Welding Engineering (IWE) Training Program by GSI SLV-TR Ankara-Türkiye, 23 October 2016-21 April 2017 | ||||||
Integrated Management Systems (ISO 9001, ISO 14001 & OHSAS 18001) Internal Auditor Training by SGS Supervise Gözetme Etüd Kontrol Servisleri A.Ş. , Ankara-Türkiye, 26-30 September 2016 | ||||||
Passive Fire Protection System Products Training, By Hilti Türkiye, Bilkent-Ankara, September 2015 | ||||||
IOSH Managing Safely Training (Cert.No.268780) by DOGA HSE Training and Consulting (British Safety Council’ exclusive delivery partner for Turkey), Bilkent-Ankara, 9-10-12 July 2015, 3 Days | ||||||
Dry Wall Systems Design and İnspection Certificate by Middle East Technical University Continuous Education Center (SEM) & Dry Wall Systems Academy (KDSA) (Lafarge Dalsan Alçı Sanayi ve Tic. A.Ş.) Ankara, June-August 2014 | ||||||
Hyfix Crystallized Waterproofing System Application Training by Interfiks Yapı Kimyasalları, Bilkent-Ankara, 16.09.2014 | ||||||
Integrated Management Systems (ISO 9001, ISO 14001 & OHSAS 18001) Internal Audit Training by SGS Supervise Gözetme Etüd Kontrol Servisleri A.Ş. Ankara-Türkiye, 04-10.06.2014, 5 days | ||||||
PMI Project Management Professional , PMP No.1551378 | ||||||
Trainer Qualifications Training by Personnel Development Academy (PDA) Bilkent-Ankara, 25-26 January 2014, 2 days | ||||||
First Aider Training and Certificate by Dönüşüm İlk Yardım Eğitim Merkezi Ankara, 12-13 December 2013, 2 days | ||||||
PM-Prepcast Project Management Course, Distance Learning 53 Hours (35 Contact Hours for PMP) by OSP International LLC 22.09-22.10.2011, 53 Hours | ||||||
Change and Leadership by A.Ates Akansel of Masters Training International www.masterstraining-int.com, Qebele-Azerbaijan, 05 December 2010, 1 Day | ||||||
DOKA Systems by DOKA The Formwork Experts, Baku-Azerbaijan, 04-06 May 2009, 3 Days | ||||||
Jotun Coatings Paint School by JOTUN Boya Türkiye, Almaty-Kazakhstan, 14.01.2007 | ||||||
Managers Health and Safety Responsibilities Course by John Jenkins CMIOSH of Jays Training, Almaty-Kazakhstan, 12 April 2008, 1 Day | ||||||
Construction Management Course by Dr. Murat Kuruoglu, ITU Civil Engineering Faculty, Baku, Azerbaijan, 01-02 September 2005, 2 Days | ||||||
Project Preparation & Project Appraisal Seminar by ADFIMI (Association of Development Finance Institutions in Member Countries of Islamic Development Bank), Baku-Azerbaijan 04-08 July 2005, 5 Days | ||||||
ISO 14001:2005 Environmental Management System and Internal Auditor Training Course by Bureau Veritas (BVQI), Baku-Azerbaijan, 19-20 May & 2-4 June 2005, 5 Days | ||||||
Behavioural Safety Audit Training by Vision Safety Ltd., Baku-Azerbaijan, 27 May 2005, 1 Day | ||||||
ISO 9001:2000 Lead Auditor Training Course by SGS Azeri Ltd., Baku-Azerbaijan, 15-19 March 2004, 5 Days | ||||||
Cafco Fendolite MII -Passive Fire Protection Application by RIGBLAST Energy Services Limited, Baku-Azerbaijan, February 2004, On-Site Training | ||||||
ISO 9001:2000 Quality Management System and Internal Auditor Training Course by MOODY International, Baku-Azerbaijan, 30 June -03 July 2003, 5 Days | ||||||
Coating Inspector Program Session I (CIP I) by NACE International, Baku-Azerbaijan, 26-31 October 2003, 5 Days | ||||||
ISO 9001:1994 Quality Management System and Internal Auditor Training Course by TEKFEN Construction Co., Baku –Azerbaijan, 25-29 November 2002, 5 Days | ||||||
SUBJECTS INTERESTED / İLGİLENDİĞİM KONULAR | ||||||
|
||||||
MILITARY SERVICE / ZORUNLU ASKERLİK HİZMETİ | ||||||
Completed in 1999 | ||||||
LANGUAGE(s) / YABANCI DİL BİLGİSİ | ||||||
|
||||||
EXPERIENCE & CAREER OBJECTIVE / MESLEKİ TECRÜBE & KARİYER HEDEFİ | ||||||
I have worked in each phase of construction from mobilization to the demobilization of the site for industrial, petrochemical and residential projects in part of Contractor and Consultant’s teams as capacity of site Engineer, Technical Office Chief, Quality Manager, Site Manager, Deputy Project Manager, QA&QC Manager, Corporate Quality Manager. I am motivated and committed to continuous learning in my professional career. I am focused, reliable person and able to work either in a team environment or individually. | ||||||
EMPLOYMENT RECORD / GÖREV ALDIĞIM PROJELER : | ||||||
Years | February 2013 – February 2017 | |||||
Company | DİA İnşaat & Altyapı Yatırımları A.Ş. (www.diaholding.com) | |||||
Job Title | Quality Manager | |||||
Project Name | Bilkent Integrated Health Campus Project | |||||
Country / Location | Ankara / Turkey | |||||
Project Description | The Project is one of the largest PPP (Public Private Partnership) project in the Turkish healthcare sector, located in Ankara. Closed construction area is about 1.200.000 m² and the campus patient bed capacity is 3662. | |||||
Job Description | Establish and maintain the project quality management system. Coordinate quality assurance and quality control activities with Project QA/QC teams, construction teams and outsourced inspection & testing agencies. | |||||
Years | January 2010 – January 2013 | |||||
Company | DİA Holding FZCO (www.diaholding.com) | |||||
Job Title | Corporate Quality Manager | |||||
Country / Location | Baku / Azerbaijan | |||||
Project Description | Baku Flame Towers Project, designed by HOK (www.hok.com), with a site area of approx 28,000 m2, the project consist of 3 towers (Hotel, Office and Residence Tower) located on a retail podium. The total construction built up area of the project is 245.000 m2. Hill International provides Project Management services. Project was started on 18.02.2008 and is planned to be completed by 3rd quarter of 2012. | |||||
Heydar Aliev Cultural Centre Project, designed by Zaha Hadid Architects (www.zaha-hadid.com), the Centre will house a conference hall, an auditorium, a library, a museum and food and beverage areas. Total build up construction area is 101,000 m2. Project was started on 29.10.2007 and major works completed in May 2012. | ||||||
Shahdag Tourism Complex Project, designed by ILF Consulting Engineers (www.ilf.com), Phase 1.1 located on the north-eastern slope of the Caucasus in the region of Gusar, Azerbaijan. Project consist of superstructure, slopes, lift terminals, infrastructure, electrical and mechanical works. The total construction built up area of the buildings (resort hotel, lift bases, staff houses, workshops, terminals and electrical and mechanical service buildings) is 75.000 m2. Project was started on 25.12.2009 and is planned to be completed by October 2012. | ||||||
The New Heydar Aliyev International Airport Project, designed by ARUP (www.arup.com) with the total construction built up area of 53.000 m2. Project was started on 28.02.2011 and terminated by the Client by end of 2011. | ||||||
Job Description | Establish and maintain the ISO 9001:2008 quality management system in all Office and Project sites. Coordinate for preparing the Project Management Manual with the Project management team for the new projects. Coordinate quality assurance and quality control activities with Project QA/QC teams. Coordinate the testing, commissioning and handover works with the relevant project team and third parties. Conduct periodical internal audits and preparing periodical Project Quality performance reports. | |||||
Years | April 2009 – December 2009 | |||||
Company | DİA Holding FZCO (www.diaholding.com) | |||||
Job Title | QA/QC Manager | |||||
Project Name | Baku Flame Towers Project | |||||
Country / Location | Baku / Azerbaijan | |||||
Project Description | Design and construction of 3 towers (Hotel, Office and Residence Tower) located on a retail podium. The total construction built up area of the project is 245.000 m2. | |||||
Client | Azinko Development MMC | |||||
Years | Nov. 2005 – March 2009 | |||||
Company | Bureau Veritas Kazakhstan LLP | |||||
Job Title | QA/QC Manager | |||||
Project Name | Esentai Park Project | |||||
Country / Location | Almaty / Kazakhstan | |||||
Project Description | Project management services for Esentai Park Project (a total built-up area of more than 324,000 square meters) that consists of41 stories (158 mt height) mix-use Tower (offices, hotel and executive apartments) Ball room, Shopping Mall, Fitness Center and 3 nos 22 stories A Class Residences of J.W. Mariott International. | |||||
Client | Capital Partners LLP | |||||
Years | Nov. 2002 – Sep. 2005 | |||||
Company | TEKFEN Construction & Installation Co. Inc. (www.tekfeninsaat.com.tr) | |||||
Job Title | QA/QC Lead Civil Engineer | |||||
Project Name | Sangachal Onshore Terminal Expansion Programme | |||||
Country / Location | Baku / Azerbaijan | |||||
Project Description | Design, detailed engineering, fabrication, construction and erection of the permanent and temporary works which consist of ACG FFD Phase 1 & 2, BTC Pump Station PSA1 and BP-Shah Deniz Gas Export Projects. | |||||
Client | AIOC, BTC & BP Exploration (Shah Deniz) Ltd. | |||||
Job Description | My responsibility is as chief QA / QC Civil Team to Co-ordinate and follow up the execution of required inspections, tests and final certification of works in accordance with contract and other contractual documents. | |||||
Years | Sep. 2001 – Oct. 2002 | |||||
Company | STFA Construction Co. (www.stfa.com) | |||||
Job Title | Technical Office Chief | |||||
Project Name | Marsa El Brega Commercial & Industrial Harbour Maintenance Project | |||||
Country / Location | Marsa El Brega, LIBYA | |||||
Project Description | Demolition and reconstruction of the east caisson breakwater superstructure. Repair of the jetty heads and approach roads, walkways and replacement of the quay deck rear slabs. | |||||
Client | General Authority for Maritime Transport and Ports | |||||
Job Description | Responsible for planning and scheduling of the works, preparation of interim statements, project control documents, and method statements, following the implementation of contract and contractual documents. | |||||
Years | Dec. 1999 – Aug. 2001 | |||||
Company | STFA Technological Inst. Inc. (www.stfa.com) | |||||
Job Title | Technical office Engineer & Civil Works Supervisor | |||||
Project Name | Construction of LPG Recovery Plant | |||||
Country / Location | Azzawiya, LIBYA | |||||
Client | Azzawiya Oil Refining Company | |||||
Job Description | Responsible for supervision of site activities such as construction of equipment foundations, demolishing and reconstructing of the several equipment and steel structure foundations of the two units during the turn around period of the refinery. | |||||
Years | Oct. 1998 – Nov. 1999 | |||||
Company | INCO / SAMCO Eng.& Civil Cont. Co (www.inco.com.tr) | |||||
Job Title | Site Manager | |||||
Project Name | Erection of 50 mtd Fatty Acid, 5 mtd Glycerine & 30 mtd Soap Noddles Plant Complex | |||||
Country / Location | Sohar / Sultanate of Oman | |||||
Project Description | The turn key contract included the civil, structural, mechanical and electrical works, such as foundations, fabrication and erection of storage tanks, pipelines and steel structure, process equipment installation, thermal insulation of pipe and vessels, Construction of R/C tanks and installation of Effluent treatment plant. | |||||
Client | Kemya Oman S.A.O.G. | |||||
Job Description | Managed and completed the turnkey contract for the construction of the Fatty Acid plant Complex. | |||||
Years | Jan. 1998 – July 1998 | |||||
Company | INCO /SAMCO Eng.& Civil Cont. Co. (www.inco.com.tr) | |||||
Job Title | Site Manager | |||||
Project Name | Erection of 100 mt/d Vegetable Oil Refinery | |||||
Country / Location | Salalah / Sultanate of Oman | |||||
Project Description | The turn key contract included the civil, structural, mechanical and electrical works. | |||||
Job Description | Managed and completed the turnkey contract for erection of 100 mt/d vegetable oil refinery. | |||||
Years | Feb. 1997-Dec.1997 | |||||
Company | INCO / SAMCO Eng.& Civil Cont.Co. (www.inco.com.tr) | |||||
Job Title | Site Manager | |||||
Project Name | Erection of 1,5 mt/hr FFR Sulphonation Plant & Tank Farm | |||||
Country / Location | Dammam / Saudi Arabia | |||||
Project Description | The turn key contract included the civil, structural, mechanical and electrical works. | |||||
Client | Modern Industries Company &Proctor & Gamble | |||||
Job Description | Managed and completed the turn key contract for the erection of FFR sulphonation plant and associated Tank farm | |||||
Years | Nov. 1996 –Jan. 1997 | |||||
Company | INCO /SAMCO Eng.& Civil Cont. Co. (www.inco.com.tr) | |||||
Job Title | Site Engineer | |||||
Project Name | Modification & Maintenance works of FWKT & Dehydration Tanks in Daleel Oil Field. | |||||
Country / Location | Daleel / Sultanate of Oman | |||||
Client | Japex Oman Ltd. |